PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Building rebar mats for Stair -4 (3rd Floor) Facing North-East (800x600).jpg Elev. 1,2,3 door frames (3rd Floor) Facing North-East (800x600).jpg Installing and tying rebar mats at Elev. 5,6 (4th Floor) Facing West (800x600).jpg Installing bearing plate boxes at Elev. 1,2,3 (3rd Floor) Facing East (800x600).jpg Installing metal decking at Derrick -3 (3rd Floor) Facing North (800x600).jpg Installing safety cables and poles at Derrick -3 (2nd Floor) Facing North (800x600).jpg Backfilling and compacting underground piping at Rahway Ave. Facing the new Building (800x600).jpg Installing rebar mats at Stair -4 (3rd Floor) Facing North-East (800x600).jpg Installing Stair frames at Stair -5 Facing West (800x600).jpg
Previous pageNext page Installing metal decking at Derrick -3 (3rd Floor) Facing North (800x600)
Installing metal decking at Derrick -3 (3rd Floor) Facing North (800x600)